Recent Planning Applications

The Old School Ermine Street North Papworth Everard Cambridgeshire CB23 3RH

11th April 2024

Single storey rear and side wrap around extension, access improvements and surfacing/landscaping works in association with the change of use from former Cambridgeshire Musical Educational Agency office to a childrens day nursery.

26B Church Lane Papworth Everard Cambridgeshire CB23 3QN

4th March 2024

S73 to vary conditions 2 (Approved plans) and 14 (Materials) and the submission of details required by conditions 4 (Surface and foul water drainage), 5 (hard and soft Landscaping scheme), 6 (Energy Statement) and 10 (Water Efficiency) of planning permissi

15 Ermine Street South Papworth Everard Cambridgeshire CB23 3QA

2nd February 2024

Poplar tree to remove remaining 3 stems to ground level following recent storm damage failure - large area of decay at base of tree, damage to base following failure and tree heavily leaning towards garden/drive way

52 Cheere Way Papworth Everard Cambridgeshire CB23 3NZ

22nd January 2024

T2 Apple - Remove to ground level and treat the stump to prevent regrowth. 1. The tree works are proposed to stop the influence of the tree on the soil below the building foundation level and provide long term stability to 52 Cheere Way, Papworth Everard,

3 Hut Field Lane Papworth Everard Cambridgeshire CB23 3GS

16th January 2024

Certificate of lawfulness under S192 for a loft conversion with rear dormer and roof lights

3 Farm Road Papworth Everard Cambridgeshire CB23 3QL

7th November 2023

T1 Ash - Reduce limb marked on image by 4m to match remaining crown. Reasons - limb overhangs property and causes leaf drop and small falling branches.

Papworth Hall Ermine Street South Papworth Everard Cambridgeshire CB23 3RD

15th September 2023

G001 - Crown Raise to 3 metres
Remove basal suckers - all shoots under 25mm diameter to be cut with loppers/secateurs to achieve a neat finish.
Reasons - to maintain view for pedestrians and vehicles, it is becoming hazardous for users due to poor

14 Wimbish Road Papworth Everard CB23 3XJ

24th August 2023

Certificate of lawfulness under S192 for a single storey rear extension and 2no. rear dormers.

Papworth Hall Ermine Street South Papworth Everard Cambridgeshire CB23 3RD

9th August 2023

5 Day Notice Dead Sycamore

Former Village Hall Ermine Street South Papworth Everard Cambridgeshire CB23 3RD

7th June 2023

Convert the former village hall to two dwellings and the erection of three dwellings at the rear.

34 Cheere Way Papworth Everard Cambridgeshire CB23 3NZ

7th June 2023

Retrospective wooden outbuilding to the rear of the property.

Papworth Hall Ermine Street South Papworth Everard Cambridgeshire CB23 3RD

31st May 2023

Submission of details required by condition 3 (Materials) and 4 (Fencing Details) of planning permission 22/04419/LBC

Papworth Hall Ermine Street South Papworth Everard Cambridgeshire CB23 3RD

30th May 2023

Submission of details required by condition 6 (Ecology Enhancement), 8 (Contamination and Remediation), 12 (Construction Environmental Management Plan) and 13 (Arboricultural Method Statement and Tree Protection Plan) of planning permission 22/04418/FUL

50 Cheere Way Papworth Everard Cambridgeshire CB23 3NZ

5th May 2023

S73 to vary condition 2 (Approved plans) of planning ref, 22/04716/HFUL (Single storey extension to side) to move the extension 500mm to the left.

Papworth Everard Fire Station Elm Way Papworth Everard Cambridgeshire CB23 3RY

30th March 2023

Demolition of Fire Station and metal training and hose-drying tower

3 Woodbrook Close Papworth Everard Cambridgeshire CB23 3UL

29th March 2023

Single storey extension to rear.

Papworth Everard Fire Station Elm Way Papworth Everard Cambridgeshire CB23 3RY

24th March 2023

Change of use from sui generis to C3, to erect 4no 2bed terraced houses.

52 Cheere Way Papworth Everard Cambridgeshire CB23 3NZ

23rd March 2023

T8 - Crack Willow, located in a belt of young/semi mature trees on the south side of the block paved shared driveway, south to south-east of 52 Cheere Way - to fell and poison or grind out the stump to prevent re-growth.

50 Cheere Way Papworth Everard Cambridgeshire CB23 3NZ

3rd March 2023

Non material amendment of planning permission 22/04716/HFUL (Single storey extension to side) to move the extension 500mm to left to centralize with existing building

23 Ermine Street North Papworth Everard Cambridgeshire CB23 3RH

27th February 2023

T1 - Large Conifer tree - remove to ground level, tree affecting out building,

Bourne House 26B Church Lane Papworth Everard Cambridge Cambridgeshire CB23 3QN

20th January 2023

Submission of details required by condition 3 (Ground Investigation) of planning permission 21/01741/FUL

Land North Of Jubilee Green Papworth Everard Cambridgeshire CB23 3RZ

13th January 2023

Outline planning for the erection of up to 6 No. dwellings, with access secured and all other matters reserved.

68 South Park Drive Papworth Everard Cambridgeshire CB23 3LF

5th January 2023

Two storey extension to side.

26B Church Lane Papworth Everard Cambridgeshire CB23 3QN

3rd October 2022

Submission of details required by condition 3 (Ground Investigation) of planning permission 21/01741/FUL

St Lukes Methodist Chapel Church Lane Papworth Everard Cambridgeshire CB23 3QN

24th August 2022

T1 - Douglas fir tree, Fell to ground level.T2 and T3 - Dead Cherry Trees, Remove.T4 - Cherry Tree, Remove.